Run: 750 Hare: Alice 'Bumble Bee' Chua Venue: Sg Long Sub-cons: Abraham and Roger
Only about 20-25 members turned up for this run at Sg Long, a place which seem to be competing for popularity with Bandar Tech.
The trail took the usual path on the right through the rubber reaching the 1st check rather quickly. This was broken way up the hill on the left. Climbing for some ten minutes brought the back pack to a clearing on the hilltop and the 2nd check. But where's the connecting trail? Not connected!!! Waranti and Farah went further up looking for paper while Charlie tried connecting the trail which was finally found on the right.
Another short climb and then looped down. The trail just played around this hill ending at the new housing construction site for a long dusty road home trail. The FRBs were out within the hour and the pack back led by Charlie out at around 7.30pm, somewhat at the same time as those who chickened out and had backtracked.
On On onsite with food prepared by the hare.
Next Run: No 751 Date: 08/12/2007 Hare: Abraham Wong Venue: Bandar Technology Kajang
The trail took the usual path on the right through the rubber reaching the 1st check rather quickly. This was broken way up the hill on the left. Climbing for some ten minutes brought the back pack to a clearing on the hilltop and the 2nd check. But where's the connecting trail? Not connected!!! Waranti and Farah went further up looking for paper while Charlie tried connecting the trail which was finally found on the right.
Another short climb and then looped down. The trail just played around this hill ending at the new housing construction site for a long dusty road home trail. The FRBs were out within the hour and the pack back led by Charlie out at around 7.30pm, somewhat at the same time as those who chickened out and had backtracked.
On On onsite with food prepared by the hare.
Next Run: No 751 Date: 08/12/2007 Hare: Abraham Wong Venue: Bandar Technology Kajang
No comments:
Post a Comment