Run: 774 Hare: Rachel Tsunami Venue: Bukit Besi SubCons: Munster, ...
About 35 members managed to come up the road leading to the Alam Damai Water tank despite complaints of poor signage and vague directions.
Most knew it was going to be a one hill trail on this very hot afternoon at this 1st time runsite for HLH4. So nearly everyone made it up the Iron Hill leaving just Bumble Bee to worry if her car will slip down the slope.
There wasn't the usuall leisurely walk warm up as the papers led immediately up the rocky outcrop from the runsite. The first check on the top was broken on the right which led around on a loop and then instead of going up to the tower, the trail went down and down.
At the foot of the hill, the papers led left before the cruelling climb right up to the tower. The slope was near 70 degrees at certain sections. The papers then led around the tower fencing to the other side.
From the tower, the trail then led down and up and down and passed through a shiggy before coming down at the construction site for the ONLY RUN of the run and which was about 100 metres on metal road. From the road it led up and back to the runsite.
FRBs Abrahim and Kiki were out in about 1hr 20 mins. Bandit limped out last with a bleeding knee at about 8pm.
On On onsite - bicycleman stuff.
Our HashFlash was not around, so NoHair sent in these pix.
Next Run: No 775 Date: 24/05/2008 Hare: Peter Fong Venue: Bandar Technology Kajang
About 35 members managed to come up the road leading to the Alam Damai Water tank despite complaints of poor signage and vague directions.
Most knew it was going to be a one hill trail on this very hot afternoon at this 1st time runsite for HLH4. So nearly everyone made it up the Iron Hill leaving just Bumble Bee to worry if her car will slip down the slope.
There wasn't the usuall leisurely walk warm up as the papers led immediately up the rocky outcrop from the runsite. The first check on the top was broken on the right which led around on a loop and then instead of going up to the tower, the trail went down and down.
At the foot of the hill, the papers led left before the cruelling climb right up to the tower. The slope was near 70 degrees at certain sections. The papers then led around the tower fencing to the other side.
From the tower, the trail then led down and up and down and passed through a shiggy before coming down at the construction site for the ONLY RUN of the run and which was about 100 metres on metal road. From the road it led up and back to the runsite.
FRBs Abrahim and Kiki were out in about 1hr 20 mins. Bandit limped out last with a bleeding knee at about 8pm.
On On onsite - bicycleman stuff.
Our HashFlash was not around, so NoHair sent in these pix.
Next Run: No 775 Date: 24/05/2008 Hare: Peter Fong Venue: Bandar Technology Kajang
No comments:
Post a Comment