Run: 1007 Hare: So Seow Hooi Venue: Bandar Technology Kajang Cohares: Bulldozer
It had been a very wet week in the Klang valley and it was still raining when the hardcore hashers came for the run. Everyone knew how the in-trail would be through the construction site, but this did not deter them.
It was still raining when On On was called at just passed six, but letting up some 15 mins into the run.
Bulldozer laid the trail through the construction site, coming out on tarred through the factories site.
All runners were out by 7.30pm. The rain had stopped long enough for the hashers to shower and clean up and then came down in sheets throughout the circle.
On On onsite, Seow Hooi's home cooked stuff.
Next Run: No 1008 Date: 10/11/2012 Hare: Sexy ShowmanVenue: Betong and Kajang 2 (Old Sin Soon Lee)
No comments:
Post a Comment