Run: 814 Hare: Susie Shopping Queen Venue: Bukit Besi Alam Damai Co-hares: Silent Dragon, Gary
About 35 members and guests managed to get to the runsite after making some preventable U-turns. Some were luckier to spot the hare putting up the signs just a little before 6pm.
The in-trail was a 10 min walk along the foot of the hill before the near vertical climb to the trail on the hill. As expected, the papers took the hashers right up to the tower. The long climb up resulted in the FRBs leaving the back pack far behind.
A circular check near the tower and aided by some cunt-fusing paper, allowed the back pack to be ahead of the FRBs on the downward stretch. But the treacherous down trail with a ravine crossing, a small uphill and a long U-turn to runsite allowed the FRBs to regain their lead. The first runner was out in about 1hr 45mins while the last out at 8.30pm.
On On onsite - Cock Pain catering.
Next Run: No 815 Date: 28/02/2009 Hare: Jagkir 'Munster' Venue: Bukit Hatamas Cheras
About 35 members and guests managed to get to the runsite after making some preventable U-turns. Some were luckier to spot the hare putting up the signs just a little before 6pm.
The in-trail was a 10 min walk along the foot of the hill before the near vertical climb to the trail on the hill. As expected, the papers took the hashers right up to the tower. The long climb up resulted in the FRBs leaving the back pack far behind.
A circular check near the tower and aided by some cunt-fusing paper, allowed the back pack to be ahead of the FRBs on the downward stretch. But the treacherous down trail with a ravine crossing, a small uphill and a long U-turn to runsite allowed the FRBs to regain their lead. The first runner was out in about 1hr 45mins while the last out at 8.30pm.
On On onsite - Cock Pain catering.
Next Run: No 815 Date: 28/02/2009 Hare: Jagkir 'Munster' Venue: Bukit Hatamas Cheras
No comments:
Post a Comment