Run: 1029 Hare: Matahari Venue: Kota Warisan Cohare: Thomas Kilat, Dorai
The scheduled hare was Matahari (sun) but getting to the runsite, from the main road, there were no matahari signs and there were also no HLH4 directional signs, instead we were greeted with only bulan (moon - general elections season) signs. From before the start and right up the ON ON, there was also no matahari, just hujan (rain).
The runsite was at the curve in the road going up just before the hilltop and away from the Co-hare's semi-D.
Unlike the previous runs here, the papers led on the opposite direction, a different route. Going under palm oil, the trial kept left, going up the 1st hill and coming down, still keeping left and to the high tension power lines. But the papers did not cross the rentice, but kept just along the boundary.
Another hill and a loop where the last check was "lost and not connected" for some back runners. The trail then hit towards the main road side and looped back, climbing the last hill back to runsite through the usual in-trail.
The rain before the run had washed off some trail marking papers, which delayed the runners somewhat but still the FROBs managed to hit home within the hour. A short while later, the rest of the group was out. Some said that it was a "motorbike run", so the hare's brother was "cooled" down.
The hare, Matahari, must have expected or maybe even summoned the rain, which had stopped for awhile just before the start of the run and then continued when circle began. He gave outMataharimau umbrellas.
On On onsite.
The runsite was at the curve in the road going up just before the hilltop and away from the Co-hare's semi-D.
Unlike the previous runs here, the papers led on the opposite direction, a different route. Going under palm oil, the trial kept left, going up the 1st hill and coming down, still keeping left and to the high tension power lines. But the papers did not cross the rentice, but kept just along the boundary.
Another hill and a loop where the last check was "lost and not connected" for some back runners. The trail then hit towards the main road side and looped back, climbing the last hill back to runsite through the usual in-trail.
The rain before the run had washed off some trail marking papers, which delayed the runners somewhat but still the FROBs managed to hit home within the hour. A short while later, the rest of the group was out. Some said that it was a "motorbike run", so the hare's brother was "cooled" down.
The hare, Matahari, must have expected or maybe even summoned the rain, which had stopped for awhile just before the start of the run and then continued when circle began. He gave out
On On onsite.
Next Run: No 1030 Date: 13/04/2013 Hare: Chong Chee Yong Venue: Taman Wawasan Puchong
No comments:
Post a Comment